Rabu, 20 Maret 2024

PELAKSANAAN KERJA BAWAH AIR TERKAIT PENGGANTIAN SPM 300.000 DWT-PT.KILANG PERTAMINA INTERNASIONAL-CILACAP / IMPLEMENTATION OF UNDERWATER WORK RELATED TO THE REPLACEMENT OF THE 300,000 DWT SPM-PT. PERTAMINA INTERNATIONAL REFINERY-CILACAP


Share :
189 view(s)

BERITA KESELAMATAN PELAYARAN PEKERJAAN BAWAH AIR

BERDASARKAN SURAT EDARAN KEPALA DISTRIK NAVIGASI TIPE A KELAS III TANJUNG INTAN NOMOR : SE-DNG.TIPE A TG.INTAN 02 TAHUN 2024 TANGGAL 19 MARET 2024 TENTANG PERINGATAN BERNAVIGASI DI ALUR SPM PERTAMINA RU IV CILACAP, BAHWA BERDASARKAN SURAT MANAJER UNDERWATER SERVICES PT.KILANG PERTAMINA INTERNASIONAL NOMOR: 220/ PME0070/2024-S5 PERIHAL PEMBERITHUAN PELAKSANAAN KERJA BAWAH AIR TERKAIT PENGGANTIAN SPM 300.000 DWT-PT.KILANG PERTAMINA INTERNASIONAL-CILACAP DAN PENGGANTIAN SUBSEA HOSE STRING A & B RU IV CILACAP DIMANA PELAKSANAN PENGERJAAN TERDAPAT PADA CALM BUOY SPM TIPE SBM SO 1232 DENGAN KOORDINAT 0749’ 16.18” S / 1090 5’20.36” E YANG AKAN DILAKSANAKAN PADA 20 MARET 2024 SAMPAI 20 APRIL 2024.

UNTUK SEMUA KAPAL-KAPAL YANG MELINTASI ALUR PELAYARAN PADA TITIK KOORDINAT TERSEBUT AGAR BERHATI-HATI DALAM BERNAVIGASI DAN TETAP MENGAMATI KEADAAN DILOKASI ALUR TERSEBUT.

Tim MSI

+6285216221177

[email protected]

ENGLISH VERSION

NAVIGATIONAL WARNING UNDERWATER WORKING

Based On The Circular Letter Of The Head Of Navigation Service Type A Class Iii Tanjung Intan Number : Se-Dng.Type A Tg.Intan 02 Year 2024 Dated March 19, 2024 Regarding Warning To Navigate In The Pertamina Ru Iv Cilacap Spm Groove, That Based On The Letter Of The Manager Of Underwater Services Pt.Kilang Pertamina International Number: 220/ Pme0070/2024-S5 Regarding The Implementation Of Underwater Work Related To The Replacement Of The 300,000 Dwt Spm-Pt. Pertamina International Refinery-Cilacap And Replacement Of Subsea Hose Strings A & B Ru Iv Cilacap Where The Implementation Of The Works There Is A Calm Buoy Spm Type Sbm So 1232 With Coordinates 070 49' 16.18 "S / 1090 5'20.36" E Which Will Be Carried Out On March 20, 2024 To April 20, 2024.

To All Vessels Crossing The Shipping Channel At The Coordinates To Be Careful In Navigating And Keep Observing The Situation In The Location Of The Channel.

 

MSI Team

+6285216221177

[email protected]

  • berita




Footer Hubla Branding